Despite massive working capital tied up in MRO inventory, a global petrochemical major struggled with inconsistent material records and an aging asset base that threatened production stability
Reduction in total inventory value within the first year.
Cost Reduction achieved through duplicate elimination and data governance.
Sourcing Savings by increasing contract compliance and leveraging JIT/VMI.
eBoM Accuracy for critical equipment, directly reducing unplanned downtime risk.
Data cleansing, normalization, and deduplication of ~65K records.
Multi-dimensional analysis: ABC (Value), XYZ (Demand), VED (Criticality), MCR (Movement).
Aligning eBoMs
( Equipment Bill
of Materials ) with
ISO 14224 standards.
Strategic Sourcing, Contract Management, JIT (Just-in-Time) delivery, and Layout Optimization. standards.
$55M+ Total Cost
Reduction
10â19% savings
across functions
By aligning every spare part with actual asset risk, you bridge the gap between financial
leanness and petrochemical plant reliability.
Donât leave your working capital locked in a warehouse.
Letâs turn your inventory into your competitive advantage.